Concrete Pumping on Lock 12 Hydroelectric Dam
Foundation construction for ventilation shaft
Bath house that Wright Concrete and Construction built
68” Clear span bridge over Guyandotte River
Concrete bridge construction
Construction and pumping of mine face slope with rail
Retaining wall in Pikeville
Concrete mud sump
Horizontal drilling rig preparing for soil nails
Pumping concrete foundation
Rebar work before concrete install
Concrete form for Lock 12 Hydroelectric Dam
Steel and concrete form for Lock 12 Hydroelectric Dam
Grouting soil nails
Armorform© Spillway
Pikeville retaining wall pre-form setting
Tying rebar for concrete wall
Construction of concrete ventilation shaft for coal mine
Tying rebar on ventilation shaft construction
Bath House that Wright Concrete and Construction built
Construction of underground slope with rail and ventilation shaft
Post-tension slab construction
Post-tension slab construction
Drilling and pressure grout curtain
Armorform spillway lining
Concrete stacking tube foundation
Concrete stacking tube finished
Construction of PHS fieldhouse
Truck construction
Mine seal installation
Underground concrete pumping
Underground seal construction
Colorado shotcrete drainage project
Colorado shotcrete drainage project
Core Drilling
Core Drilling
Rock anchor drilling at Lock 12 Hydroelectric
Bridge pier construction
Concrete bridge pumping
ICF wall pumping
Wright Mix-Material
Wright-Mix Material Plant – Logan Wv.
Wright-Mix Material Plant – Logan Wv.
FlexNite TSL(Thin Skin Liner)
FlexNite TSL(Thin Skin Liner)
Wright Xpress conveyor belt install
Wright Xpress vulcanizing prep
Wright Xpress
Wright Xpress underground belt installation
Wright-Mix Material plant – Logan, Wv.
Wright Block and Precast – Allen Ky. Plant
Strapped Concrete Block
Strapped Concrete Block
Meridian Brick
Block inventory – Allen Ky.
